CASE
江苏泰信机械科技有限公司
Position:
Homepage
/
/
Offshore Construction in Qatar

Offshore Construction in Qatar

  • Categories:Case
  • Author:
  • Origin:
  • Time of issue:2022-08-05
  • Views:0

(Summary description)

Offshore Construction in Qatar

(Summary description)

  • Categories:Case
  • Author:
  • Origin:
  • Time of issue:2022-08-05
  • Views:0
Information

This project is a coastal port project in Qatar. The diameter of the drilling hole is 600mm. The main construction stratum is limestone with a depth of 11m.  The time to complete a pile is 120 minutes. The rotary drill rig is built on a pontoon bridge, which is not very stable. The drill bit uses a coring barrel drill. Under the premise of meeting the construction requirements, the features of KR125 rotary drilling rig, being dexterous in control, light in body is very suitable for this kind of project 

Scan the QR code to read on your phone

CONTACT

 

Add:NO.108-4-1911 HUISHAN AVENUE,HUISHAN ZONE,WUXI CITY, JIANGSU PROVINCE,CHINA

Tel:+86 18921287030

E-mail:apie@apiepiling. com

PIEU

Wechat

APIE

Brochure QR code

Copyright © 2021 Piling Industry Elite Union of China      苏ICP备2022017736号