CASE
江苏泰信机械科技有限公司
Hunan pylon foundation construction
- Categories:Case
- Author:
- Origin:
- Time of issue:2022-08-05
- Views:0
(Summary description)
Hunan pylon foundation construction
(Summary description)
- Categories:Case
- Author:
- Origin:
- Time of issue:2022-08-05
- Views:0
Information
This project is a high voltage line project in Hunan Province. KR110D rotary drilling rig is mainly used for the excavation of the foundation. KR110D walking traction is 230KN, with the expandable chassis, it has the ability of slope climbing of 25°. The construction strata:
1. Soil sandwiched stone, strong weathered rock, drilling diameter of 1800mm, drilling depth of 12m, hole forming in 2.5 hours.
2. Strongly weathered and moderately weathered rock, drilling diameter 2000mm, drilling depth 12.8m, hole forming time is 9 hours. KR110D's excellent operational control, strong construction power, and efficient construction results have won the customer's appreciation.
Scan the QR code to read on your phone
Next:
None
Next:
None
Previous :
Construction using mixing pipe in Singapore
Next :
None
Previous :
Construction using mixing pipe in Singapore
Next :
None
CONTACT
Add:NO.108-4-1911 HUISHAN AVENUE,HUISHAN ZONE,WUXI CITY, JIANGSU PROVINCE,CHINA
Tel:+86 18921287030
E-mail:apie@apiepiling. com
Brochure QR code
Copyright © 2021 Piling Industry Elite Union of China 苏ICP备2022017736号