CASE
江苏泰信机械科技有限公司
Position:
Homepage
/
/
Quartzite construction in Malaysia

Quartzite construction in Malaysia

  • Categories:Case
  • Author:
  • Origin:
  • Time of issue:2022-08-05
  • Views:0

(Summary description)

Quartzite construction in Malaysia

(Summary description)

  • Categories:Case
  • Author:
  • Origin:
  • Time of issue:2022-08-05
  • Views:0
Information

 

This construction site is in Malaysia. The geological structure of the project is relatively complex. The quartzite hardness reaches 80MPa, the drilling diameter is 1500mm with a drilling depth of 8m. The time to complete a hole is 14 hours. When compared with the performance of a Bauer BG36 rotary drilling rig on the same site, the customer was very satisfied with the excellent performance of this KR285C. 

 

Scan the QR code to read on your phone

CONTACT

 

Add:NO.108-4-1911 HUISHAN AVENUE,HUISHAN ZONE,WUXI CITY, JIANGSU PROVINCE,CHINA

Tel:+86 18921287030

E-mail:apie@apiepiling. com

PIEU

Wechat

APIE

Brochure QR code

Copyright © 2021 Piling Industry Elite Union of China      苏ICP备2022017736号